This article describes how to run parallel jobs in ESTEL on "simple" networks of workstations.
Note that the methodology differs slightly for real high performance facilities such as Blue Crystal or other Beowulf clusters. Therefore, there is a dedicated article for clusters.
We call a network of workstations a set of workstations which can "talk" to each other via Intra/Internet.
Pre-requesites
- You need to have a working MPI configuration on the network of workstations. See the article about installing MPI.
- The parallel library in the TELEMAC tree needs to have been compiled. See the article about installing the TELEMAC system.
Run a parallel job on one machine
Using one process
Before running ESTEL in parallel, you need to start an mpd.
Before trying to run real parallel jobs it is interesting to check that the "parallel" library and ESTEL are playing nicely together. This can be achieved by running an existing test case with with test case for which you add in the steering file:
PARALLEL PROCESSORS = 1
Using the keyword PARALLEL PROCESSORS
will force ESTEL to use the parallel
library instead of the paravoid
library. As we request one processor only, no MPI calls will be done.
If this does not work. Stop here and try to understand what is going wrong. You can email error messages (full messages) to JP Renaud who will help if necessary.
Using multiple processes
edit estel steering file
parallel processors = 2
estel3d